Forum | Merseyside Dennis Dart Website

Full Version: Merseyrail
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428
I'll join the "underwhelmed" group here. The concourse, as I've already said, is nice, but at platform level, especially on the Northern Line, it is extremely poor. Barely any additional platform capacity has been obtained, by knocking through a small walled off area between the escalators. Some of the new escalators run slowly and already squeal, plus as mentioned, various tiled and cladded sections were incomplete. On the trackside, the corrugated walls remain a real eyesore and are absolutely filthy. It is hardly an improvement at all - a little brighter but for me a total waste of £20 million and nearly seven months.

Today, both advertising sets were on the Northern Line once again. 507002 was on the Ormskirk line between the peaks, later forming the 17.13 Liverpool Central - Southport and continuing into the night. 508111 was on the Southport line all day.

Also, a very unusual sight on the Southport line tonight. Track assessment unit 950001 was seen passing through Freshfield at around 22.45 heading for Southport.
(22/10/2012 23:22)jtd508110 Wrote: [ -> ]I was there today and against all the feedback that I have heared, I was impressed. Yes it is unfinished, but it really makes the station feel more like a station of today, and the dangerous rubber slippy floors have gone which makes it better. Maybe the upstairs seating is to encourage people to stay off the platform until their train comes to ease overcrowding downstairs and a potentially fatal accident.

I think your last point kind of proves that the station is a death trap then. I sat upstairs briefly but realised it was a fruitless exercise as the caption board decided after a few minutes that we didn't need to know when the trains were in and just display "Welcome to Liverpool Central". The station is woefully inadequate and they should have done something better with it.
I was kind of shocked when I went myself yesterday, I was expecting more as well, It was slightly nicer, but it still felt the exact same, the upper level is fantastically done! I am really looking forward to when they complete the upper level opening for Central Village.
I'm personally not a fan of the new escalators as they are much more slower then the original ones, and to me, there was something about them that made me feel they were old, perhaps the dirt on the central column?

I personally prefer the Wirral Line platforms, but you can't please them all! Laugh
as i went to central again today i thought also the new esculators were very slow, but their isnt much seating on the northern line either, but i think everything looks fantastic excellent job done to the upstairs, and the lift is still small but i think the large lifts at chester would suit central if you had two of them. i've overheard some people saying that platform 3 looks like a london underground platform.

507009 did you get any photos of 950001 and if its still at southport tomorrow what times would it go through hightown?

Wave
Have been told there set to industry standard working speed the escalators , most escalators i have used elsewhere seem to run a bit quicker but that maybe my imagination.
I suspect Merseyrail are attempting to reduce their "escalator accident" figures by slowing them down.
My understanding is the concourse was a project managed by Merseyrail and the platforms were sorted out by Network Rail.

As for the lift, I was told that NR wanted to add a second lift but the land owners of the shopping centre wouldn't sell the land to NR as they didn't want Central to close for refurb. There is nothing stopping an extra lift going in if NR are able to buy the land in future.
(24/10/2012 07:52)snowey Wrote: [ -> ]My understanding is the concourse was a project managed by Merseyrail and the platforms were sorted out by Network Rail.

As for the lift, I was told that NR wanted to add a second lift but the land owners of the shopping centre wouldn't sell the land to NR as they didn't want Central to close for refurb. There is nothing stopping an extra lift going in if NR are able to buy the land in future.

That's just a rumour, sorry!

The shopping centre land is leased from Network Rail estates, (which is why BTP deal with shoplifting and other crime in the centre). The standard occupation agreements allow Network Rail to make most modifications, with or without the occupiers consent. Regardless, the new lift would not have affected the precinct so that idea is totally incorrect.

At design stage, a bigger lift was to be incorporated into the station, 2 new, larger, lifts for the Northern Line and the existing lift retained for the Wirral Line.

1 lift would have went from the staff accomodation block straight to the HX end of the platform and was supposed to enable Network Rail/contractor staff to move tools and equipment from the depot to the track for possessions etc, instead of down the emergency staircase/through the station.

The second, passenger, lift would have went from the new covered walkway, (where the gravel fenced off area used to be) down to platform level on the Northern Line.

The "Wirral" lift would have stayed the same.

Quite simply, they ran out of money, much to the annoyance of many stakeholders.
The Government pulled the plug on most of the money from the better stations pot of money , hence the watered down revamp.
not surprised Government pulled money, always do with anything up north we have to have the scraps while london get any amount it wants, merseyrail deserves better central needed a better refurb that it has got platforms ain't changed just new floor still gonna be overcrowded at peak times i thought this money was supposed to changed that from what people have showed in pictures it ain't changed
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428
Reference URL's