Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428
I have recently read that unless merseyrail places the order for units that would be numbered 777053 - 777112 when the grand national race event is happening, the entire 52 unit fleet would all be required in liverpool leaving the wirral without a train service.

I would say that for the transition from 1 class of units to another, that merseyrail could do the transition the same way as was done when the 502 & 503 units were replaced.

The 507s were the first to arrive solely for the northern line and replaced the 502s.

Then the 508s began arriving and replaced the 503s.

My point is that all the 507/508 units could be transferred to the wirral upon completion of the delivery of units 777001 - 052 and then when 777053 - 112 start arriving then begin replacing the 507/508 units.

I definitely think that at least 1 of each class needs to be preserved because I think in 2024 or 2025 is 50 years since 507001s construction was completed in 1974/5 with 1 of the 508s formed as a 4 coach unit, granted they couldn't run as a 7 coach formation unless the start and terminus point for a tour was long enough to accommodate 7 coaches ( chester for example ).
(07/05/2020 12:33)313201 Wrote: [ -> ]I definitely think that at least 1 of each class needs to be preserved because I think in 2024 or 2025 is 50 years since 507001s construction was completed in 1974/5 with 1 of the 508s formed as a 4 coach unit, granted they couldn't run as a 7 coach formation unless the start and terminus point for a tour was long enough to accommodate 7 coaches ( chester for example ).

Yes, I couldn't agree more with saving at least one coach from each class. Even if it isn't a runner, something is better than nothing. It would be fantastic to do something with the carriages from 508101/121 outside the Emergency Services place in Seacombe. Other than the Connex-themed interiors and the cycle space, they're remarkably original. These would look fantastic restored to original blue and grey colours.

507001 was delivered on 29th September 1978 so it's approaching 42 years old, although one problem with the refurbished sets is how different they are from when new. Restoring one to original nick would be a heck of a job and would need a lot of part robbing from other PEP-derived trains (such as the 315s). I'd still love to see a 507 preserved, however.

On the Class 314 farewell tour there was some discussion about preserving one, and a fair few actually suggested not bothering if one couldn't be made to run. I don't understand that way of thinking: saving one from the cutter's torch is what matters. Still, the 314s never captured people's imagination in the way the 303s did; I think the same is true with the 507/8s compared with the 502/3s to an extent.
My thought was of keeping the now current internal mods and lights but returning at least 1 or both units to blue & grey and keeping the external head and tail lights as well as the brighter headlights
My understanding is that there is an option to buy more units but that would only be needed for expansion of the network such as Skelmersdale, 52 would be enough at the present time
(07/05/2020 12:33)313201 Wrote: [ -> ]I have recently read that unless merseyrail places the order for units that would be numbered 777053 - 777112 when the grand national race event is happening, the entire 52 unit fleet would all be required in liverpool leaving the wirral without a train service.

If you don't mind me asking, where did you find this out?
Hi Walton 46

I found that info in an article from rail magazine which was published on 28/01/2020.
There’s no chance of that happening. Even with network extensions to Skelmersdale and towards Wrexham, I would think no more than 60 sets would be bought
With 52 units there is enough to operate the Wirral and Northern Line on Grand National festival week , im led to believe it will be 50 or 51 out of 52 units on those days , this will be the only time when the availability will be have to be that high on a regular basis.

Dont forget a 4 car 777 (64.98 m) is 5.5 metres longer than the comparable 507/508 (59.4m).
(05/05/2020 21:57)507022 Wrote: [ -> ]777004

Has there been any confirmation that one of the new units will be arriving to Kirkdale depot this Wednesday evening?
There have been multiple paths booked on RTT over April from Dollands Moor sidings to Kirkdale and a continuous schedule booked from 17th June onwards. None of the ones booked in April ran and all paths are booked in as "runs as required".
It’s definitely due this week. A picture has appeared of it waiting at Altenrhein to depart for the UK.
I also believe 777005 is due to come the following week, but that could change due to Covid-19
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428