Forum | Merseyside Dennis Dart Website

Full Version: [Archive] Northern (Arriva Rail North)
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
(02/03/2017 10:22)boby32 Wrote: [ -> ]According to live signal at lime street

http://www.charlwoodhouse.co.uk/rail/livesig/3

319375, 319377 and 319382 are are Platforms 1, 2 and 3.

I hope 319364 and 319367 aren't damaged.

No damage to either unit, just stuck in dead sections. Both had their pans up when they were on Allerton.

SO.
Latest estimate for trains running to Liverpool Lime St is 9th March

http://www.networkrailmediacentre.co.uk/...ay-9-march
The Pendolino in platform 7 is 390010, 156459 & 158770/813 are in platform 9
(03/03/2017 10:13)boby32 Wrote: [ -> ]A class 319 almost hit debris.

http://www.bbc.co.uk/news/uk-england-mer...e-39146773

Don't believe everything you read! The line speed there is 30mph, so don't know why it's been suggested he was doing 50! I understand the train was travelling much slower than that.

I would estimate the unit stopped about a quarter of a mile from the debris.

SD.
Sorry SD but that is not sensational enough. And I would imagine that the 200 tons of rubbish has probably got one extra 0 on it.
(03/03/2017 15:54)childwallblues Wrote: [ -> ]Sorry SD but that is not sensational enough. And I would imagine that the 200 tons of rubbish has probably got one extra 0 on it.

You're probably right! Although there is a lot of it, I wouldn't want it on my foot!

Laugh

SD.
Post to see previous post.
What does that mean?
(05/03/2017 21:19)childwallblues Wrote: [ -> ]What does that mean?

It means that a new post has been put onto the thread but can't be seen until there is another post on there. It tends to happen when the thread comes to fresh page.
Reference URL's