(09/01/2014 20:43)LJ51 DDA Wrote: [ -> ]Got to laugh aint ya Smithy some of the things people come out with haha, would be nice if Arriva Reinstated the Late night 11's to Chester though instead of the last one being 17:15 makes Days out easier up the coast then :P
Oh it makes you laugh alright!!
I would love to have the late Chester back however it's contracted out Mon-Sat to GHA. It was the only Chester journey I didn't mind doing for overtime when I was a driver.
are all the rhyl opentops being replaced by daf open tops this year
Hey is this a load of rubbish ive heard, but is 2620 coming to bangor?? because of 2511 been RIP!!
Can anyone clarify this
Many Thanks
(21/01/2014 18:56)cx04axy Wrote: [ -> ]Hey is this a load of rubbish ive heard, but is 2620 coming to bangor?? because of 2511 been RIP!!
Can anyone clarify this
Many Thanks
doubt rhyl will get rid of 2620 it is the first wright pulsar
(22/01/2014 06:51)Conbus Wrote: [ -> ] (21/01/2014 18:56)cx04axy Wrote: [ -> ]Hey is this a load of rubbish ive heard, but is 2620 coming to bangor?? because of 2511 been RIP!!
Can anyone clarify this
Many Thanks
doubt rhyl will get rid of 2620 it is the first wright pulsar
That's not a valid reason for keeping a bus, they probably couldn't care less that it's the first Pulsar manufactured.
So im guessing no one knows
(22/01/2014 20:02)cx04axy Wrote: [ -> ]So im guessing no one knows
There are no plans for 2620 to be transfered to Bangor.
very weird sighting
Optare solo 0696 on the 0800 from rhyl - Llandudno on the 12.
(23/01/2014 18:40)smithy29919 Wrote: [ -> ] (22/01/2014 20:02)cx04axy Wrote: [ -> ]So im guessing no one knows
There are no plans for 2620 to be transfered to Bangor.
thanks i thought it was bizzare, with Bangor shortly receiving new pulsar 2's
There is highly likely to be a closure of a bridge linking Rhyl with Kimnel Bay .
The main deck of the A548 Foryd Harbour Bridge, which connects Rhyl to Kinmel Bay, must be completely replaced because of corrosion damage.
Any road closure, which is likely to last for a maximum of three weeks, would not happen until at least October.