Current time: 23/05/2024, 12:21 Hello There, Guest! (LoginRegister)

Post Reply 
TransPennine Express
RE: First Transpennine Express
(06/11/2013 08:52)childwallblues Wrote:  The revised service from Manchester Airport to Scotland via Wigan from 8th December will start with Class 185s as the 350/4s are unlikely to be available.

I had heard that the leasing company wants to do some testing with the other variants of the class 350's first .

Did any of the LM fleet have to do the same testing with there variants ?
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
(07/11/2013 20:46)wirralbus Wrote:  
(06/11/2013 08:52)childwallblues Wrote:  The revised service from Manchester Airport to Scotland via Wigan from 8th December will start with Class 185s as the 350/4s are unlikely to be available.

I had heard that the leasing company wants to do some testing with the other variants of the class 350's first .

Did any of the LM fleet have to do the same testing with there variants ?
There were no variants as such. The 350/1 were a cancelled order for DC 450s.

All time rail mileage travelled 327264 miles
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
(08/11/2013 06:33)childwallblues Wrote:  
(07/11/2013 20:46)wirralbus Wrote:  
(06/11/2013 08:52)childwallblues Wrote:  The revised service from Manchester Airport to Scotland via Wigan from 8th December will start with Class 185s as the 350/4s are unlikely to be available.

I had heard that the leasing company wants to do some testing with the other variants of the class 350's first .

Did any of the LM fleet have to do the same testing with there variants ?
There were no variants as such. The 350/1 were a cancelled order for DC 450s.

But as such the 350/1 and 350/2 have different speed limits
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
That came later, they were both 100mph when new.

SD.
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
New 350401 was brought north yesterday from Dollands Moor to LNWR Crewe by Eurotunnels 92043.

All time rail mileage travelled 327264 miles
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
350401 is to start test running today between LNWR Crewe and Carnforth.

All time rail mileage travelled 327264 miles
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
(11/11/2013 07:20)childwallblues Wrote:  350401 is to start test running today between LNWR Crewe and Carnforth.

The run was cancelled today but there is a path booked for the rest of the week.
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
350401 had its first outing North today to Carnforth (14th Nov).
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
No service north of York tomorrow due to the expected high winds.
Cancelling services in advance seems to becoming more common, but must be a tactic that works
Find all posts by this user
Quote this message in a reply
RE: First Transpennine Express
Network Rail are going to impose speed restrictions which are going to cause there to be less capacity than there otherwise would have been north of York , don't forget not all the railway north of York is a four track railway.

Lets see if they (Network Rail ) have got it right again.
Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 1 Guest(s)