Forum | Merseyside Dennis Dart Website

Full Version: Metrolink
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
(18/01/2017 21:31)T42 PVM Wrote: [ -> ]I noticed an Article about this on the Manchester Evening News, going from some of the comments to the link on their Facebook page theres a lot of people not happy with the new operator also being the same people currently operating Southern Rail

Keolis is a separate business and it only owns 35% of the Govia Thameslink Railway (Great Northern, Thameslink, Southern & Gatwick Express). The other 65% being owned by Go-Ahead.

As a duo, the KeolisAmey partnership which will be taking over the Metrolink operations currently only run the DLR (Docklands Light Railway) and nothing else.
get me there set to be rolled out across Metrolink from the summer

http://www.britishtramsonline.co.uk/news/?p=16434

Credit: British Trams Online.
Second City Crossing opening date announced

http://www.britishtramsonline.co.uk/news/?p=16641

Credit: British Trams Online.
The "early 2017" target date has therefore been met. I just wonder how long it will be until Manchester Airport services are extended to Victoria.
Manchester Metrolink Second City Crossing opened today .
Metrolink’s Second City Crossing opens

http://www.britishtramsonline.co.uk/news/?p=16738

Credit: British Trams Online.
Is it the Metrolink's 25th birthday today ?
(06/04/2017 15:17)wirralbus Wrote: [ -> ]Is it the Metrolink's 25th birthday today ?

Correct
(06/04/2017 15:46)Y474 KNF Wrote: [ -> ]Correct

3092 has had its yellow spots reformed to show 25 and there's text on the windows.
Metrolink outage ‘not cyber attack’

https://www.railnews.co.uk/news/2017/05/...ttack.html

Credit: Railnews.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Reference URL's