(11/09/2025 12:22)CX06 EBK Wrote: [ -> ]It'll be a long wait then, most of the Stagecoach hydrogen buses are still dumped on the back wall at Gillmoss.
Hydrogen buses project looks to have been scrapped, due to reliability and the sky rocketing costs of hydrogen at the moment
(24/09/2025 18:47)chris-s Wrote: [ -> ]Possible permanent and nothing into replace due to recent transfers in from Southport
Thanks, hopefully permanent and only 12 more to go.
The recently fitted next stop led screens on the top decks of the enviro 400 fleet has been removed due to safety issues. A new position to place them elsewhere is being worked on