Merseyrail
|
|
||||||
RE: Merseyrail
Anyone know what unit number failed today, just after Hamilton Square on way to Liverpool? New Brighton 6 car train had to assist the broken down Chester train (2C24) to James Street (Platform 2) and then onwards to Birkenhead North depot, I think as a 9 car train, would have been good to see that. |
||||||
|
||||||
RE: Merseyrail
(27/10/2020 15:49)wirralbus Wrote: I agree with you on that one , holding road traffic back will eventually im sure result in complaints both to Network Rail and to a lesser extent Merseyrail. The Southport line has always had history of exceptional railhead (now known as reportable!) conditions, its just that there's always been a healthy turnaround at Southport to recover. |
||||||
|
||||||
RE: Merseyrail
(29/10/2020 15:40)508134 Wrote: Anyone know what unit number failed today, just after Hamilton Square on way to Liverpool? Not sure on the failure but the rescue set should have been 507033 and 508143. These were working together on the xx23 departure from New Brighton this morning but had been replaced by 507018 and 508115 later on. 507033 in fact worked ECS to Kirkdale late afternoon.
3101(i) | 3305 | 3616 | 4012 | 4159 | 4100 | 4102 | 4118 | 4127 | 4475
313044 | 313064 | 313220 | 314206 | 314210 | 315809 | 315839 | 315857 | 507001 | 507002 | 507006 | 507008 | 507009 | 508114 | 508138 | 508208 |
||||||
|
||||||
RE: Merseyrail
(29/10/2020 15:40)508134 Wrote: Anyone know what unit number failed today, just after Hamilton Square on way to Liverpool? 507015 |
||||||
|
||||||
RE: Merseyrail
It seems both the Ellesmere Port and Chester trains now have to run as 3 cars due to more power supply issues now affecting the Ellesmere Port line as well. Does anyone know where the other locations is with power issues, besides past Capenhurst towards Chester as previously reported? |
||||||
|
||||||
RE: Merseyrail
Spital to Eastham Rake |
||||||
|
||||||
|
||||||
RE: Merseyrail
(30/10/2020 19:09)508134 Wrote: It seems both the Ellesmere Port and Chester trains now have to run as 3 cars due to more power supply issues now affecting the Ellesmere Port line as well. The Chester issue has been sorted, its Eastham to Spital in both directions. The 3 cars at the moment though are more down to an increasing unit shortage thanks to recent failures. You can actually still run 6 cars through the current restricted areas. |
||||||
|
||||||
RE: Merseyrail
(31/10/2020 08:04)ls1911 Wrote: The Chester issue has been sorted, its Eastham to Spital in both directions. The 3 cars at the moment though are more down to an increasing unit shortage thanks to recent failures. You can actually still run 6 cars through the current restricted areas. That’s true, there’s no problem with 6 cars but as long as they’re run under E-conditions, where power taken is limited |
||||||
|
||||||
RE: Merseyrail
I was wondering with regard to the power issues, is it possible that these problems ( as well as being a result of the seasons and possibly the weather ) could be as a result of upgrades for the new trains. It puzzles me because if the new trains are built to run on 750 volts like the current stock, why are they upgrading the power system because I would have thought a power upgrade would only be necessary if the new trains were built to run on 800 or even 850 volts. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 56 Guest(s)