Northern (Arriva Rail North)
|
|
||||||
RE: Northern (Arriva Rail North)
(26/09/2017 20:33)T42 PVM Wrote: I see the Timetables for the North West are up now, must be a mistake on the Liverpool - St Helens Central/St Helens Junction one as says Buses finish about half 6 but its Rail Replacement anyway so should not be affected by the strike at all.. The replacement bus arrangement which apply for engineering works change on strike days. The Mid-Cheshire line has the last Manchester bound train replaced by a bus next week but that late bus isn't operating on strike days. However, earlier bus replacement services are operating which wouldn't have operated if there wasn't a strike. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
One thing which has had very little publicity, is that there will be a Preston-Ormskirk, and Wigan-Kirkby services operating on Sunday |
||||||
|
||||||
|
||||||
RE: Northern (Arriva Rail North)
(30/09/2017 22:51)N271CKB Wrote: One thing which has had very little publicity, is that there will be a Preston-Ormskirk, and Wigan-Kirkby services operating on Sunday Was no Preston to Ormskirk service a month or so ago when Merseyside Transport Trust had there open day as Burscough Station was closed. This must be a new thing |
||||||
|
||||||
|
||||||
RE: Northern (Arriva Rail North)
Here's the new live signalling map with the 4th track and Roby and Huyton stations. http://www.charlwoodhouse.co.uk/rail/livesig/3 |
||||||
|
||||||
RE: Northern (Arriva Rail North)
https://mobile.twitter.com/i/web/status/...8644134913 |
||||||
|
||||||
RE: Northern (Arriva Rail North)
https://mobile.twitter.com/i/web/status/...1373048832 |
||||||
|
||||||
RE: Northern (Arriva Rail North)
Are trains to Lime Street diesel or electric this week. I had assumed diesel but the Engineering Access Statement doesn't make any reference to being blocked to electric traction, but does refer to a shuttle service, which I seem to recall was the original intention, with connections at Edge Hill? |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(10/10/2017 12:12)mikestone Wrote: Are trains to Lime Street diesel or electric this week. I had assumed diesel but the Engineering Access Statement doesn't make any reference to being blocked to electric traction, but does refer to a shuttle service, which I seem to recall was the original intention, with connections at Edge Hill? All 319s apart from 1x156 |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 11 Guest(s)