Northern Trains Ltd
|
|
||||||
RE: Northern Trains Ltd
(18/05/2021 09:55)knutstransport Wrote: See posts 216, 217 and 218. These were created while 4 car 150s were still running on the Southport services, so probably used the trains not being used while lines were running at a reduced frequency. There was always a plan to reform some 150s in to 3 car sets when the cascaded trains arrived from GWR, to use alongside the 2 x 3 car 150/0s.Thank you for that. I didn't see those posts. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 4 Guest(s)