Northern Rail
|
|
||||||
RE: Northern Rail
(19/03/2016 17:13)jtd508110 Wrote: More 319 problems today by the looks of it. 15:40 from the airport was cancelled due to a train fault, pretty sure I saw a fair few diesels about but maybe this is normal for a Saturday. By my reckoning, the requirements are 4 for the WIG, 3 for the VIC, 3 for the MIA & 2 (or is it 3) for the WARR, so with 20 units you would think some failures wouldn't affect them |
||||||
|
||||||
RE: Northern Rail
Are Arriva Trains Northern going to be imported with a 319 fleet that is highly problematic to say the least , the diesel fleet didnt seem to give Abellio this much trouble . |
||||||
|
||||||
RE: Northern Rail
(19/03/2016 19:23)507022 Wrote: By my reckoning, the requirements are 4 for the WIG, 3 for the VIC, 3 for the MIA & 2 (or is it 3) for the WARR, so with 20 units you would think some failures wouldn't affect them Not forgetting 3 for LSP - Preston. Not sure how many are required for Manchester Pic - Manchester Airport shuttles though. |
||||||
|
||||||
RE: Northern Rail
(19/03/2016 17:13)jtd508110 Wrote: More 319 problems today by the looks of it. 15:40 from the airport was cancelled due to a train fault, pretty sure I saw a fair few diesels about but maybe this is normal for a Saturday.Yes it was cancelled. I had to get the 1550 MAN-LLD to NLW and pick up the 1603 ex MCV to BGE. All time rail mileage travelled 327264 miles |
||||||
|
||||||
|
||||||
RE: Northern Rail
(19/03/2016 19:28)wirralbus Wrote: Are Arriva Trains Northern going to be imported with a 319 fleet that is highly problematic to say the least , the diesel fleet didnt seem to give Abellio this much trouble . According to RAIL Arriva will be taking on 12 additional 319s this year, even though Blackpool and Bolton wires won't be ready, so presumably that'll give them the flexibility to give all 32 x 319s a proper overhaul both mechanically and internally. |
||||||
|
||||||
RE: Northern Rail
319361's and 319380's failures can't have been serious. Drove them both on the 17/3 and all was well. SD. |
||||||
|
||||||
RE: Northern Rail
(20/03/2016 14:36)knutstransport Wrote: According to RAIL Arriva will be taking on 12 additional 319s this year, even though Blackpool and Bolton wires won't be ready, so presumably that'll give them the flexibility to give all 32 x 319s a proper overhaul both mechanically and internally. It will be interesting to see which units they are. Logically it should include the six remaining 319/3's. Logic doesn't always apply though! SD. |
||||||
|
||||||
RE: Northern Rail
(20/03/2016 17:36)Sprinterdriver Wrote: It will be interesting to see which units they are. Logically it should include the six remaining 319/3's. Logic doesn't always apply though!At least 319370/72/73 visited Wolverton Works last year and were repainted into Thameslink livery. All time rail mileage travelled 327264 miles |
||||||
|
||||||
RE: Northern Rail
Any that do come will need the door control modifications before they enter service too. SD. |
||||||