Current time: 04/05/2024, 18:19 Hello There, Guest! (LoginRegister)

Post Reply 
Cheshire East proposed funding cuts
RE: Cheshire East proposed funding cuts
(20/10/2017 20:32)Nicholas Wrote:  The route identifiers might be internal references, with the winning bidder able to choose the route number. A similar practise happened in Dorset - they tendered routes that they referred to as 1 to 7, however the operators were able to select what number was used (the same as existing in 5 out of 7).

In this case they don't all have existing numbers due to part withdrawal of routes and the remaining sections being lumped together in to a new route.

I imagine it's also possible some operators will look at the proposed replacement for a service they currently operate and think "we could provide a service at least as good as that on a commercial basis", as some operators have done in the past which then gives them more flexibility over timings, the exact route etc.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Cheshire East proposed funding cuts - knutstransport - 21/10/2017 09:50



User(s) browsing this thread: 1 Guest(s)