[Archive] Northern (Arriva Rail North)
|
|
||||||
RE: Northern (Arriva Rail North)
1316 Liverpool Lime st-Manchester Airport was cancelled due to a problem at the depot. 1740 Manchester Airport-Liverpool Lime st was due to operate but didn't because the replacement was slower than the normal allocation of a 319. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
A slower diesel really wouldn't lose too much time over a electric , if that was the excuse then that is a feeble excuse for a cancellation , at best skipping some stops would have sorted that out . |
||||||
|
||||||
RE: Northern (Arriva Rail North)
From TfGM: 19:00 Manchester Airport-Barrow in Furness changes from a 3 car Class 185 to a 3 car Northern unit with a resulting increase in available capacity The following services will remain as 4 carriage workings but see a slight decrease in available capacity due to the formation of train units used: 07:57 Wigan NW – Victoria 08:21 Blackpool North – Huddersfield 08:44 Victoria – Southport 10:23 Southport – Manchester Airport 11:15 Huddersfield – Wigan Wallgate 12:03 Manchester Airport – Southport 13:45 Wigan Wallgate – Stalybridge 14:23 Southport – Manchester Airport 15:08 Stalybridge – Victoria 16:03 Manchester Airport – Southport 16:11 Victoria – Stalybridge 16:30 Stalybridge – Wigan Wallgate 18:15 Southport – Manchester Airport 18:24 Wigan Wallgate – Victoria 19:35 Victoria – Wigan Wallgate 20:03 Manchester Airport – Southport 22:18 Southport – Manchester Piccadilly The following train services which previously ran as 4 car units will now run as 2 carriage: 03:38 Lime Street – Manchester Airport 04:34 Manchester Airport – Lime Street 06:36 Victoria-Leeds 18:14 Victoria – Wigan NW 19:03 Wigan NW – Lime Street The above are a direct result of the TPE 170s leaving and going to Chiltern with Northern needing to find replacements for the 185s used on North West routes. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
Does northern at this present have a three car units at its disposal , other than attaching a 153 to something ? |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/06/2016 11:16)wirralbus Wrote: Does northern at this present have a three car units at its disposal , other than attaching a 153 to something ? They have the 8 x 3 car 158s mainly used on Calder Valley services but it's understood the Barrow working will be either a 150+153 or a 156+153. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/06/2016 09:17)wirralbus Wrote: A slower diesel really wouldn't lose too much time over a electric , if that was the excuse then that is a feeble excuse for a cancellation , at best skipping some stops would have sorted that out . Have to say that it's poor cancelling so many services along that line. An operator might find it cheaper if they don't run a service over not stopping at some stations. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
I think a cancelled service will incur bigger charges than a service which skips stops out to make time up. In the old days it used to be a part cancellation would equal a quarter of a cancellation , don't know if this still applies . |
||||||
|
||||||
RE: Northern (Arriva Rail North)
Network rail now say it will be the 24th June before services can resume between Buxton and Stockport , this is now becoming a serious washout |
||||||
|
||||||
|
||||||
RE: Northern (Arriva Rail North)
Overhead Wires around St Helens are playing up meaning some Trains are cancelled and others are delayed For Blog Posts Containing all the latest in the local Bus Scene The 2002 Bus Blog Subscribe to my Youtube Channel, Updated regularly! All my Social Media Links here! https://linktr.ee/TerencePrice |
||||||