Current time: 11/05/2024, 21:24 Hello There, Guest! (LoginRegister)

Post Reply 
Arriva North West - Birkenhead Depot
RE: Arriva North West - Birkenhead Depot
The current 408/9 circular was only introduced to cover the withdrawn section of the 403. The 409 will probably revert to its original route both ways via Liscard Rd. Just another cutback to the LS PVR.. Blaming the bridge is poor although I'd love to see the dropped mileage figures for the 410/411.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Arriva North West - Birkenhead Depot - DVG526 - 20/06/2018 20:41



User(s) browsing this thread: 6 Guest(s)