Lancashire Triangle Electrification
|
|
||||||
RE: Lancashire Triangle Electrification
(27/04/2013 05:17)wirralbus Wrote: Is this going to be three or four lines through Roby and Huyton , dont seem to be able to tell at the moment . The initial plan is for three lines through Roby and Huyton, and when the hub is completed, then a fourth line (on the far disused platform) will be built IF DEEMED NECESSARY at that time. AFAIK this is not a definite at the moment. Interestingly, the two current lines will both be Liverpool bound, and the new third (and possible) fourth line will be Wigan/Manchester bound, completely different from the layout in BR days |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 36 Guest(s)