Transport for Wales Rail
|
|
||||||
RE: Transport for Wales Rail
The ‘new’ timetable needs looking at again. If from December 1V98 is hauled as suggested and goes non stop LLJ-CTR, this leaves a hour and half gap in the afternoon peak up the coast eastbound as 1J70 is also non stop. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 3 Guest(s)