Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: Stagecoach Chester & Wirral
(29/03/2018 19:15)Turbostar19 Wrote: Looks like funding for the Flintshire section must have been the issue.It is stupid, I don't see why they removed their funding to now put it back in last minute. As it was a CWACC tender, they would have spoken to Flintshire CC to work out any improvements and requirements from that side before issuing the ITT (Invitation to tender) so Flintshire obviously made it clear they were removing their funding before the ITT was issued. (29/03/2018 19:18)CTL45 Wrote: My previous response was moderated - I'll try again, the responsibility for this situation lies with Flintshire council and not with any bus operator. That is a fact, not conjecture, unlike some comments here that somehow remain unmoderated. I did mean if Flintshire had sorted it sooner as I knew it was a Flintshire funding issue and not a Stagecoach issue. (Like the DB2, being withdrawn as Flintshire won't fund Saltney Ferry and Curzon park doesn't have enough passengers hence Handbridge linked into 62). |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 82 Guest(s)