Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: Stagecoach Chester & Wirral
5A is only to Stanney Grange CWACC says. The 5 is Eport - Mold. Stagecoach do 1 there 2 back because it was in conjunction with Arriva. That is no longer the case. I do think the 5 will divert via Stanney though en-route to Mold. That could increase journey times so overall I estimate 1h 5min round trip. 5A only takes 20 minutes so 1h 5min + 2x5A then back onto route 5 (sp) It is possible the 5A will interwork with the 6 but in that case why not number it 6A or something relevant to the 6? Numbering it 5A would suggest it works with the 5 somehow whether that be interworking or running to/from the same place or along the same route somehow. The fact the SPs are being renumbered as well. Why would the SPs be registered with the 5A (stanney grange 6) if they weren't working together. You would just amend the SPs and add 6A to the route 6. Too much says the routes will move either to Chester or to Rock Ferry. All my assumptions could be completely wrong but too much links together. Registering them, renumbering (not like confusion was being caused). |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 19 Guest(s)