Cheshire East proposed funding cuts
|
|
||||||
RE: Cheshire East proposed funding cuts
(06/02/2018 10:26)knutstransport Wrote: Sounds like Route E won't be turned in to a super route, as D&G have made 3 separate registrations which relate to it. With the Macclesfield - Knutsford service being called 88 and the Knutsford - Wilmslow - Altrincham service being 88/88A/188, it looks hopeful that they might have these as through services. It will also be good if the 89 Northwich - Knutsford is clearly shown on timetables etc as linking with the 88/88A/188 as this was built into the design of the timetable for the E routes. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 12 Guest(s)