Current time: 17/05/2024, 07:16 Hello There, Guest! (LoginRegister)

Post Reply 
Northern (Arriva Rail North)
RE: Northern (Arriva Rail North)
Just to remind everyone that Liverpool Lime Street will be reopened tomorrow.
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
And many of the suspended services are re-instated as well.
.
Ithought this had been posted before, and that I posted it yesterday too!
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
But the amended timetable will run until September this year.

http://www.nationalrail.co.uk/service_di...today.aspx
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
(29/07/2018 08:28)boby32 Wrote:  But the amended timetable will run until September this year.

http://www.nationalrail.co.uk/service_di...today.aspx

75% of trips which were removed are being reinstated so a revised timetable is still technically in operation as the other 25% are still cancelled.

Lakes Line is fully back up and running
Ormskirk is still missing 6 services (Ran by RRB)
13 services missing between Colne and Blackpool South (Ran by RRB)
Some trips are apparently removed between Blackburn and Southport via MCV
6 trips missing between Kirkby and Manchester

Liverpool timetable is as normal I think (except Glazebrook has 1 return RRB Mon-Fri to Irlam for some random reason. Surely it would be easier to make the train stop http://prntscr.com/kccklb )
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
Also Liverpool - Wigan/Blackpool returns back to 3tph/1tph from tomorrow as well as the through Liverpool - Manchester - Crewe service although there will be a limited Liverpool - Warrington Bank Quay service until September.
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
Class 331 has arrived in Liverpool.

https://www.youtube.com/watch?v=FQFMi5Rjb4M
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
https://www.northernrailway.co.uk/temporary-timetables
;
has the details, despite that with the usual lack of competence, it says until 31st July in the heading.
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
323 227 has been in and out of Liverpool Lime street over the past few days on driver training duties between Liverpool and Wigan.
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
170472 and 170473 have arrived at Crewe today in unbranded Spotrail, presumably to be painted.
Find all posts by this user
Quote this message in a reply
RE: Northern (Arriva Rail North)
(02/08/2018 12:01)mikestone Wrote:  170472 and 170473 have arrived at Crewe today in unbranded Spotrail, presumably to be painted.

Painted and refurbished*. Two other ones are going/have gone to Newton Heath for crew training purposes ahead of their introduction on Southport to Leeds services.

* New seat cushions and covers, new carpets, internal repaint, USB charging points (if not already fitted) and wifi.
Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 4 Guest(s)