Current time: 22/12/2024, 12:56 Hello There, Guest! (LoginRegister)

Post Reply 
Arriva's Cost Cutting
RE: Arrivas Cost Cutting
(03/07/2016 12:38)T42 PVM Wrote:  Their due this summer

If and when the new deckers arrive for Liverpool depots will they be MMC's? Other areas of the Arriva empire are now receiving MMC's rather than the old Enviro400 design.
Find all posts by this user
Quote this message in a reply
RE: Arrivas Cost Cutting
Whenever they turn up the vehicle pvrs and staff have still been reduced. And instead of having to replace nearly 100 vehicles it's only a small chunk having to be ordered instead to satisfy the original actual requirements
Find all posts by this user
Quote this message in a reply
RE: Arrivas Cost Cutting
(03/07/2016 12:43)Barney Wrote:  If and when the new deckers arrive for Liverpool depots will they be MMC's? Other areas of the Arriva empire are now receiving MMC's rather than the old Enviro400 design.

They should be MMC's if they're brand new ADL 400's as the old design finished last year
Visit this user's website Find all posts by this user
Quote this message in a reply
RE: Arrivas Cost Cutting
(03/07/2016 12:43)Barney Wrote:  If and when the new deckers arrive for Liverpool depots will they be MMC's? Other areas of the Arriva empire are now receiving MMC's rather than the old Enviro400 design.

Yes they will be MMCs but I don't know when they're arriving. The order is for around 50 buses with around half of the order being for Green Lane and the other half due for Speke
Find all posts by this user
Quote this message in a reply
RE: Arrivas Cost Cutting
(03/07/2016 12:05)mr t Wrote:  I know there has been quite a few across GM which I dont pay attention too including TFM contracts which have all been lost over the year. Dont know if it will include Chester then, Winsford seems to have lost a few vehicles/services too forgot about that one.
The 79C saved 4 buses.
And then by redistributing some vehicles between depots this year that is how all the X/Y reg vehicles are being phased out with zero investment since the last batch of deckers. Its why they havent really been very competitive lately in terms of new or improved services and winning contracts.

the 79/79c saved 3 buses but the 110 service as had a bus added into the allocation so were as there was only 2 min recovery they now drop back at Warrington
Find all posts by this user
Quote this message in a reply
RE: Arrivas Cost Cutting
(03/07/2016 02:43)mr t Wrote:  Speke
500/699 reduced

I'm sure the 699 PVR hasn't been reduced. Still should be a total PVR of 9 with 5 used during the off-peak period on weekdays. The timetable for September 2016 appears virtually identical to what it was when I was at uni.

Overall, Speke's PVR hasn't actually gone down anyway because the 79 PVR was increased by two buses at the end of last summer. IIRC, there were other routes which had a bus or two added to the PVR to increase reliability (was the 10/10A one?) so it's not necessarily a net reduction of 5 buses at each depot.

3101(i) | 3305 | 3616 | 4012 | 4159 | 4100 | 4102 | 4118 | 4127 | 4475
313044 | 313064 | 313220 | 314206 | 314210 | 315809 | 315839 | 315857 | 507001 | 507002 | 507006 | 507008 | 507009 | 508114 | 508138 | 508208
Find all posts by this user
Quote this message in a reply
RE: Arrivas Cost Cutting
(06/07/2016 18:24)507009 Wrote:  I'm sure the 699 PVR hasn't been reduced. Still should be a total PVR of 9 with 5 used during the off-peak period on weekdays. The timetable for September 2016 appears virtually identical to what it was when I was at uni.

Overall, Speke's PVR hasn't actually gone down anyway because the 79 PVR was increased by two buses at the end of last summer. IIRC, there were other routes which had a bus or two added to the PVR to increase reliability (was the 10/10A one?) so it's not necessarily a net reduction of 5 buses at each depot.

The 10 was reduced from 5 buses to 4 per hour. I think the 10A remains as it was.
Visit this user's website Find all posts by this user
Quote this message in a reply
RE: Arriva's Cost Cutting
As an aside, still talking Arriva here but the conducterless trains is bound to be part of the cost cutting measures.
Find all posts by this user
Quote this message in a reply
RE: Arriva's Cost Cutting
The 10 was reduced some time ago now, Wythenshawe have lost 4 School Contracts and gained only 1 so that should release a DLP or 2

For Blog Posts Containing all the latest in the local Bus Scene The 2002 Bus Blog
Subscribe to my Youtube Channel, Updated regularly!
All my Social Media Links here! https://linktr.ee/TerencePrice
Visit this user's website Find all posts by this user
Quote this message in a reply
RE: Arriva's Cost Cutting
(06/07/2016 22:02)T42 PVM Wrote:  The 10 was reduced some time ago now, Wythenshawe have lost 4 School Contracts and gained only 1 so that should release a DLP or 2

So Another heap or two heading this way instead of to Barnsley
Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 2 Guest(s)