Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417


RE: Merseyrail - 507022 - 31/10/2020 21:24

It has been caused by the power upgrade work.
Prior to these works, the voltage varied presumably depending how far away from the substations it was. I think these upgrades were to stabilise the voltage across the network, but maybe others could confirm that or not.
The 777s are more computer based and have safety systems which will prevent a lot of the problems we have currently


RE: Merseyrail - ls1911 - 31/10/2020 22:01

(31/10/2020 21:24)507022 Wrote:  It has been caused by the power upgrade work.
Prior to these works, the voltage varied presumably depending how far away from the substations it was. I think these upgrades were to stabilise the voltage across the network, but maybe others could confirm that or not.
The 777s are more computer based and have safety systems which will prevent a lot of the problems we have currently

Pretty much spot on.
To put it simply the 507/508s can mostly cope with the voltage coming in under 750v for whatever reason whereas the 777s won't be able to


RE: Merseyrail - 508134 - 31/10/2020 22:29

(31/10/2020 08:04)ls1911 Wrote:  The Chester issue has been sorted, its Eastham to Spital in both directions. The 3 cars at the moment though are more down to an increasing unit shortage thanks to recent failures. You can actually still run 6 cars through the current restricted areas.

I would have expected if they were short on units to reduce the New Brighton services first-they are still going as 6 cars during the day.
They made a point of highlighting to passengers when the Chester trains reduced to 3 car, that the route between Hooton and Liverpool would still maintain some 6 cars (by running the Ellesmere Port trains as 6 cars).
Although, I guess with the New Brighton they can quite easily reduce to 3 car for the evening-not as easy doing this if 6 cars continued to run on the Ellesmere Port line?


RE: Merseyrail - ls1911 - 01/11/2020 08:33

(31/10/2020 22:29)508134 Wrote:  I would have expected if they were short on units to reduce the New Brighton services first-they are still going as 6 cars during the day.
They made a point of highlighting to passengers when the Chester trains reduced to 3 car, that the route between Hooton and Liverpool would still maintain some 6 cars (by running the Ellesmere Port trains as 6 cars).
Although, I guess with the New Brighton they can quite easily reduce to 3 car for the evening-not as easy doing this if 6 cars continued to run on the Ellesmere Port line?

Yeah you're pretty much spot on.
New Brighton is a short route so a couple of 6 cars don't eat up the milage like an all day 6 car diagram on the Ellesmere Ports/Chester's do.
Another bonus point is the units on the New Brighton/ West Kirby lines can be built up/split and changed over quite easily and both run past the maintenance depot.


RE: Merseyrail - wirralbus - 01/11/2020 21:38

You do have to wonder if the Southport service may drop from 15 minute to 30 minute with the start of the lockdown phase coming up .


RE: Merseyrail - wirralbus - 05/11/2020 15:54

From November 9th , Southport - Liverpool Central service will be reduced from 15 mins to 30 minute interval service.


RE: Merseyrail - 313201 - 08/11/2020 22:28

Hi Everyone, I hope you are all ok

I was wondering if anybody knows anything about possible vandalism on the wirral line today.

Apparently there were lots of passengers asking staff what was going on as services were being delayed.

Also, Is there any news on the next delivery of 777s.


RE: Merseyrail - iMarkeh - 09/11/2020 02:49

(08/11/2020 22:28)313201 Wrote:  Hi Everyone, I hope you are all ok

I was wondering if anybody knows anything about possible vandalism on the wirral line today.

Apparently there were lots of passengers asking staff what was going on as services were being delayed.

Also, Is there any news on the next delivery of 777s.
Looking on RealTimeTrains, services before 9am were cancelled due to a 'signalling issue'. I suppose that could have been as a result of vandalism.


RE: Merseyrail - 507022 - 09/11/2020 11:54

It wasn’t vandalism, it was a damaged fibre optic cable


RE: Merseyrail - wirralbus - 09/11/2020 14:47

Services have been suspended for a while on the ormskirk line to due to bridge bash at Old Roan , services have now resumed but services didnt operate for about 90 to 120 minutes .

A shuttle service operated from Aintree to Hunts Cross and from Maghull to Ormskirk , during the disruption.