[Archive] Northern (Arriva Rail North)
|
|
||||||
|
||||||
RE: Northern (Arriva Rail North)
Assuming that Northern will have 28 class 319s later this year. There are 3 diagrams on Liverpool-Manchester Airport 3 diagrams on Liverpool-Manchester Vic 4 diagrams on Liverpool-Wigan 2 diagrams on Liverpool-Warrington Bank Quay 3 diagrams on Liverpool-Preston (+1 extra diagram which is the new 1717 Liv-Preston Service) 1 diagram on Manchester Piccadily-Manchester Airport. This means that there are 17 class 319 in activity and 11 spare. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/07/2016 15:28)boby32 Wrote: Assuming that Northern will have 28 class 319s later this year. There are You're forgetting the future electrification in the North West,any spare 319s won't be spare once that's completed |
||||||
|
||||||
RE: Northern (Arriva Rail North)
Don't forget, Northern are due a further 12 319's in total, so after this batch, there will only be another 4 due until the new builds arrive. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/07/2016 15:30)Gordon V Wrote: You're forgetting the future electrification in the North West,any spare 319s won't be spare once that's completed The Manchester-Preston line will be electrified from December 2017 and the Preston-Blackpool line will be electrified from early 2018. (see https://www.networkrail.co.uk/North_West...tion.aspx) I forgot to say that from now until December 2017, there will be 17 class 319 in activity and 11 spare. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/07/2016 15:45)boby32 Wrote: The Manchester-Preston line will be electrified from December 2017 and the Preston-Blackpool line will be electrified from early 2018. There's also the current 323 work that will be taken over by 319s when Northern lose 323s |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/07/2016 15:47)Gordon V Wrote: There's also the current 323 work that will be taken over by 319s when Northern lose 323s Northern will lose the 323 in 2018. (http://www.railmagazine.com/news/2015/08...ser-group) Surely there must be spare of 319 between now and december 2017? |
||||||
|
||||||
RE: Northern (Arriva Rail North)
Repeat of link,as could not open that one in previous messages https://www.networkrail.co.uk/North_West...ation.aspx |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(13/07/2016 15:12)boby32 Wrote: If the existing Blackpool-Liverpool service (2F65) leaving 1803 is to be started at Preston leaving 1832, then this news service from Preston leaving at 1832 can be run by a 319 which has previously formed the Liverpool-Preston service (2N88). Here's the diagram Wouldnt that leave the 1832 service at the mercy of a PPM failure , 2 minute turnaround is unworkable coming into the autumnal phase of the year. |
||||||
|
||||||
RE: Northern (Arriva Rail North)
(17/07/2016 19:19)wirralbus Wrote: Wouldnt that leave the 1832 service at the mercy of a PPM failure , 2 minute turnaround is unworkable coming into the autumnal phase of the year. Correct,you sometimes have late starts from Preston with the current 5 minute turnaround time during the daytime.Also not that it makes any difference in the grand scheme of things boby32 but the 1717 Lime St-Preston is 1N80 not 2N88,it's head code has changed as of this week |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 18 Guest(s)