Metrolink
|
|
||||||
RE: Metrolink
(27/07/2014 07:18)childwallblues Wrote: I went up to Bury yesterday for the Class 14 gathering at the East Lancs Railway. As there were no trams due to engineering to Altrincham, East Didsbury, Eccles or Media City all Bury line trams were running to Ashton. I am also surprised by the use of single trams yesterday, when there were so many spare units due to engineering works on the western sections! I rode a single unit from Ashton to Piccadilly, heading for Bury, at around 7pm. On June 14th I went to Bury for a meal woth a friend. It was a double working, and I sat at the front of the rear unit (if you get my drift). Thus it creted the appearance as though we were running driverless and pushing the front unit for good measure! |
||||||
|
||||||
RE: Metrolink
Two more T68s set for UK Tram fleet as 1022 leaves Manchester http://www.britishtramsonline.co.uk/news/?p=8628 Credit: British Trams Online. |
||||||
|
||||||
RE: Metrolink
Pair of M5000s sat on the bridge over the M56 at Wythenshawe including 3066 at 08.00 this morning with pantographs down . Still there at 10.00 |
||||||
|
||||||
RE: Metrolink
New platform set to open at Deansgate-Castlefield http://www.britishtramsonline.co.uk/news/?p=8720 Credit: British Trams Online. |
||||||
|
||||||
RE: Metrolink
Other than before the end of 2014 has anybody heard of a definitive date for the Manchester Airport tram service to begin. Is this service going to start from Cornbrook when it does start ? |
||||||
|
||||||
RE: Metrolink
(16/09/2014 17:43)wirralbus Wrote: Other than before the end of 2014 has anybody heard of a definitive date for the Manchester Airport tram service to begin. I last heard that they will be start service before Xmas time but not confirm yet? |
||||||
|
||||||
RE: Metrolink
(16/09/2014 17:43)wirralbus Wrote: Other than before the end of 2014 has anybody heard of a definitive date for the Manchester Airport tram service to begin. I had heard the beginning of November and yes it will only run as far as Cornbrook until the 2nd City Crossing is done. |
||||||
|
||||||
RE: Metrolink
Once the Second City Centre crossing is complete isn't the Manchester Airport service going forward to Shaw & Crompton . |
||||||
|
||||||
|
||||||
RE: Metrolink
Is there a plan to increase the frequency on the Ashton line in the near future from every 12 minutes down to every 6 minutes during times of high demand , we already see an alteration to services when there is events on at the Etihad. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 7 Guest(s)