Merseyrail
RE: Merseyrail
piece in tonights echo about central with picture looks a lot better concourse by ticket hall is opened up and more light coming in from glazing, toilet must be getting moved somewhere else
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
I went through on a hunts cross bound train last night and the train sounded its horn when passing through central then i spotted maintenance workers on the southport bound track just inside the tunnel south of central they were inspecting the points between the reversing siding and main track they were having to use torches as the tunnel lighting was not on.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
The northern line escalator facing the lift at central has now been completely stripped you can see right into the machine room underneath it from passing hunts cross boud trains looks fascinating down there!
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
Its amazing what you can do with a bit of money and imagination .

Liverpool Central's Northern Line platforms where getting close to design capacity at certain times of the day , I do wonder though how long it will be before more capacity is required again at Liverpool Central.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
i think it will be a while yet all the underground stations need a facelift that brown plastic is very out dated i'm glad central gets done first as it bad around tea time everyday u couldn't move on the platform at times i just wondering are they extending the walls next to the tracks so more room again
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
There was disruption on the ormskirk line earlier this morning due to trespassers on the track in the maghull area trains were starting anmd terminating at aintree the police had their helicopter out i could see it from where i work at edgehill university ormskirk normal service resumed at midday.
Find all posts by this user
Quote this message in a reply
Engineering Work 2013
ENGINEERING WORK 2013 - AFFECTING MERSEYRAIL ELECTRICS
Code:
Start    End    Route    Work
06/01/2013 00:45    07/01/2013 05:00    Wirral Line turns back at Birkenhead Ctl/North    James St Refurb
13/01/2013 00:45    13/01/2013 05:00    Wirral Line turns back at Birkenhead Ctl/North    James St Refurb
10/02/2013 00:30    11/02/2013 05:00    Sandhills to Ormskirk/Kirkby Closed    Tamping & Renewals - Walton Jn
17/02/2013 00:30    18/02/2013 05:00    Hunts Cross - Liverpool Central Closed    Tamping & Renewals - Lpool Central
24/02/2013 00:35    25/02/2013 05:30    Rock Ferry-Chester/Ellesmere Port Closed    Hooton resignalling
24/02/2013 00:35    25/02/2013 05:30    Helsby-Ellesmere Port Closed    Hooton resignalling
21/04/2013 00:45    21/08/2013 23:59    Wirral Line Platform Closed Lime Street    Lime St Refurb
21/04/2013 00:45    22/04/2013 05:00    Wirral services turn back at James St 1+2    Lime St Refurb
28/04/2013 00:45    29/04/2013 05:00    Wirral services turn back at James St 1+2    Lime St Refurb
08/09/2013 00:55    09/09/2013 05:00    Rock Ferry-Chester/Ellesmere Port Closed    Hooton renewals
15/09/2013 00:55    16/09/2013 05:00    Rock Ferry-Chester/Ellesmere Port Closed    Hooton renewals
22/09/2013 00:55    23/09/2013 05:00    Birkenhead Ctl-Chester/Ellesmere Port Closed    Hooton/Rferry renewals
29/09/2013 00:20    30/09/2013 05:00    Hunts Cross - Liverpool Central Closed    Brunswick track renewals
06/10/2013 00:20    07/10/2013 05:00    Liverpool S Parkway - Hunts Cross Closed    Tamping & Renewals - HX West Jn
24/11/2013 00:45    25/11/2013 05:00    Birkenhead North-West Kirby/New Brighton Closed    Tamping at Bidston East Jn

Notable work:
24/02/2013 - 1 day - Hooton SB closed and control transferred to Chester PSB
21/04/2013 until 21/08/2013 - 4 months - Liverpool Lime Street (Low Level) Closed for refurbishment
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
2013 looks to be a bit busier in the engineering work stakes than 2012 has been .

The one im more concerned about is Hooton resignalling , signalling work is always fraught with dangers , we all saw what happened with the IECC at sandhills when it was introduced on the Wirral line , the service was utterly devastated until they came up with a plan to replace TC's with axle counters , never mind the fact that James Street PSB worked perfectly with TC's around the loop.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
james street refurb within a week must not need a lot
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(02/07/2012 13:01)Harryn9000 Wrote:  james street refurb within a week must not need a lot

Those turnbacks at Birkenhead Central / Birkenhead North are at the end of the refurbishment , that will have been going on a while by then .