Merseyrail
|
|
||||||
|
||||||
RE: Merseyrail
There was a line problem yesterday afternoon on the Ormskirk line which probably prevented the 6 car from forming. This pair is formed by running a 3 car ECS from Kirkdale to Ormskirk to couple with a service train, and couldn't do so with the line blocked.
3101(i) | 3305 | 3616 | 4012 | 4159 | 4100 | 4102 | 4118 | 4127 | 4475
313044 | 313064 | 313220 | 314206 | 314210 | 315809 | 315839 | 315857 | 507001 | 507002 | 507006 | 507008 | 507009 | 508114 | 508138 | 508208 |
||||||
|
||||||
RE: Merseyrail
(15/11/2013 08:28)507009 Wrote: There was a line problem yesterday afternoon on the Ormskirk line which probably prevented the 6 car from forming. This pair is formed by running a 3 car ECS from Kirkdale to Ormskirk to couple with a service train, and couldn't do so with the line blocked. Ah right thanks for that have seen that 6 car coupling up at ormskirk a few times. |
||||||
|
||||||
RE: Merseyrail
(15/11/2013 12:04)MX12CFE Wrote:(15/11/2013 08:28)507009 Wrote: There was a line problem yesterday afternoon on the Ormskirk line which probably prevented the 6 car from forming. This pair is formed by running a 3 car ECS from Kirkdale to Ormskirk to couple with a service train, and couldn't do so with the line blocked. Is there a reason for the train coupling up at Ormskirk , rather than at the Liverpool end of the route . |
||||||
|
||||||
RE: Merseyrail
This evenings West Kirby 6 car formation is another pair of consecutively numbered units. 508136 and 508137. Don't think I've ever seen these 2 run together before! |
||||||
|
||||||
RE: Merseyrail
(15/11/2013 12:26)wirralbus Wrote:(15/11/2013 12:04)MX12CFE Wrote:(15/11/2013 08:28)507009 Wrote: There was a line problem yesterday afternoon on the Ormskirk line which probably prevented the 6 car from forming. This pair is formed by running a 3 car ECS from Kirkdale to Ormskirk to couple with a service train, and couldn't do so with the line blocked. Not enough turnaround time usually a minimum of 5 minutes required to couple and prep cabs. |
||||||
|
||||||
RE: Merseyrail
(15/11/2013 20:02)Merseyrail 507/508 Wrote:(15/11/2013 12:26)wirralbus Wrote:(15/11/2013 12:04)MX12CFE Wrote: Ah right thanks for that have seen that 6 car coupling up at ormskirk a few times. I believe it was actually a coupler fault on 508124, units would not couple at Ormskirk |
||||||
|
||||||
RE: Merseyrail
When a coupler fault occurs is there something stopping them from running two three cars, 7 and a half minutes apart? “People's backyards are much more interesting than their front gardens, and houses that back on to railways are public benefactors.” - John Betjeman |
||||||
|
||||||
|
||||||
RE: Merseyrail
(15/11/2013 20:02)Merseyrail 507/508 Wrote:(15/11/2013 12:26)wirralbus Wrote:(15/11/2013 12:04)MX12CFE Wrote: Ah right thanks for that have seen that 6 car coupling up at ormskirk a few times. I have seen this in the morning where a three replaces a six car and the six car just goes into the reverser at Liv Cen and follows the service train out to Kirkdale . Is the 1535 from Orm a busy service ? |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 10 Guest(s)