Current time: 28/11/2024, 02:16 Hello There, Guest! (LoginRegister)

Post Reply 
Merseyrail
RE: Merseyrail
(14/08/2020 22:32)ant17612 Wrote:  Has 508134 been moved from New Brighton then?

Yes. It's at Birkenhead North depot and has been for a couple of weeks

SK15 GZG
2010 | 2345 | 2474 | 2590 | 3052 | 3059 | 3061 | 5314 | 6408 | 6606 | 7537
4164 | 4593 | 4664 | 4670 | 4672 | 4678 | 4836
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 22:45)SK15 GZG Wrote:  Yes. It's at Birkenhead North depot and has been for a couple of weeks

Cheers for that I thought so. Will save my mate a wasted trip.

---
Thanks
Ant

Check out my YouTube Channel updated regularly at 18:00 Most Days;
https://www.youtube.com/c/apdmediatransp...nel/videos

Check out my content on Flickr:
https://www.flickr.com/photos/envirohunter
https://www.flickr.com/photos/envirohunter/albums

Updated recently with a trip down to the South Coast in 2021 & Railway Pictures from 2017.
Visit this user's website Find all posts by this user
Quote this message in a reply
RE: Merseyrail
ROG loco 57312 has just passed Nuneaton on its way to Birkenhead North
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
66756 is working the Dollands Moor to Kirkdale 777 delivery today
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(19/08/2020 06:44)507022 Wrote:  66756 is working the Dollands Moor to Kirkdale 777 delivery today

These are 777008 and 777010.

---
Thanks
Ant

Check out my YouTube Channel updated regularly at 18:00 Most Days;
https://www.youtube.com/c/apdmediatransp...nel/videos

Check out my content on Flickr:
https://www.flickr.com/photos/envirohunter
https://www.flickr.com/photos/envirohunter/albums

Updated recently with a trip down to the South Coast in 2021 & Railway Pictures from 2017.
Visit this user's website Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(19/08/2020 09:50)ant17612 Wrote:  These are 777008 and 777010.

These two sets are the last for a while now. I believe that apart from 001/2 the remainder will come with door modifications and end doors done
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
These where the units that had been in a near enough complete state when Covid 19 hit Europe , all other units after these two will have been built post covid 19 .

I wonder how much spare space there is there for these units , its going to come to a point soon where units will come for commissioning and then have to go elsewhere for storage , Merseyrail hasnt got an awful lot of siding space do they ?
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(19/08/2020 11:47)wirralbus Wrote:  These where the units that had been in a near enough complete state when Covid 19 hit Europe , all other units after these two will have been built post covid 19 .

I wonder how much spare space there is there for these units , its going to come to a point soon where units will come for commissioning and then have to go elsewhere for storage , Merseyrail hasnt got an awful lot of siding space do they ?

The Butchers Sidings in Southport are an option - but as 507022 has said there's no deliveries for a while it could end up being a "one in and one out" situation by the time deliveries resume again

SK15 GZG
2010 | 2345 | 2474 | 2590 | 3052 | 3059 | 3061 | 5314 | 6408 | 6606 | 7537
4164 | 4593 | 4664 | 4670 | 4672 | 4678 | 4836
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
There are the sidings for the former stabling area at birkenhead central as well.

All that would be required would be replacement of the track and installation of the 3rd rail into the stabling shed which was done to enable a 3 coach unit to move out from the shed without the need to be pulled out by another unit.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(19/08/2020 12:27)313201 Wrote:  There are the sidings for the former stabling area at birkenhead central as well.

All that would be required would be replacement of the track and installation of the 3rd rail into the stabling shed which was done to enable a 3 coach unit to move out from the shed without the need to be pulled out by another unit.

I think there is a roof issue to the shed at Birkenhead Central , hence why it was already looked at and im sure its been rejected.
Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 132 Guest(s)