Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: First Chester & Wirral
The problem with First on the Wirral is that the depot itself is a bit cramped for space when most of the vehicles are on site , the amount of vehicles they have allocated now is about the maximum that the site can safely accomodate . Its near the point that to operate any different services would require a service to be withdrawn to provide the vehicles . Its not ambition they need the depot manager at Rock Ferry would probably like a depot with more space . In a way Chester depot suffers the same problem not enough space . |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 28 Guest(s)