Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: Stagecoach Chester & Wirral
(12/08/2016 20:06)mtl97 Wrote: Chester depot is full plus when they move 6 to rock ferry if they keep the work in north wales work they could possibly take on extra mold to e port work that arriva dropped that is 2 buses work monday to friday, its a lot of worked gained for rock as 41/42 increase in frequency from september 4th, they save 1 bus though with heswall to west kirby 38 withdrawn, i think stagecoach will be quite happy with there expanding network in this area makes a big change to when first were in charge & cutting back often I know Chester is full but if reports are true that Chester has taken over GHAs outstation in tarvin for the school buses and as an overflow then surely they would have the space, I could understand Rockferry operating the 6 if Chester wasn't there but given the fact that Chester is slightly nearer than Rockferry I can't see the need for it for it to change what happens if it doesn't then pull in the profits |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 64 Guest(s)