Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: Stagecoach Chester & Wirral
(12/08/2016 19:14)chester285 Wrote: What's the actual logic behind moving the 6 to RF are Rockferry short of routes Chester depot is full plus when they move 6 to rock ferry if they keep the work in north wales work they could possibly take on extra mold to e port work that arriva dropped that is 2 buses work monday to friday, its a lot of worked gained for rock as 41/42 increase in frequency from september 4th, they save 1 bus though with heswall to west kirby 38 withdrawn, i think stagecoach will be quite happy with there expanding network in this area makes a big change to when first were in charge & cutting back often |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 29 Guest(s)