Howards/Springfield
|
|
||||||
RE: Howards/Springfield
(02/08/2016 05:57)knutstransport Wrote: The contract GHA had was 5 return workings but that contract was due to expire in the autumn. The 289 used to be every 2.5 hours but it was re-routed to serve High Legh following the withdrawal of the 47 Knutsford to Warrington service, which had already been reduced to a token service due to a dispute between Network Warrington and councillors in Cheshire over subsides. Didnt the 37/38 that Warrington Coachways ran go via High Legh to Altrincham as well? |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 2 Guest(s)