Greater Manchester Tenders
|
|
||||||
RE: Greater Manchester Tenders
(13/03/2016 17:49)james Wrote: TAME VALLEY LOCAL LINK to cover b`bottom gamesley and a stop at market hall glossop exactly what i said ?????? Look back at your original post you said the 341/202 is being taken over by Local link. How can it be taken over if the contract is being axed? You also stated that DCC will meet the cost when actually the cost of re-routing the Tame Valley Local link will be shared equally by DCC and TFGM. As for the 394 you demanded evidence that the 394 was to run 2 hourly by high peak as as far you were concerned it was still out to tender, when in actual fact at the time I posted it had already been announced on Councillor Anthony Mckeown's blog that High Peak were going to run it two hourly mon-fri. If you want any further evidence let me know! |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 8 Guest(s)