Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: Stagecoach Chester & Wirral
(24/02/2016 09:26)Barney Wrote: I wasn't aware that the EOGs had a reliability issue. Was it ever resolved or were they withdrawn prematurely from front-line services and put on less demanding routes as the Ribble VRs were? If I remember rightly, the only real issue with the EOG was although it was capable of 70mph, the brakes wernt adequate enough to stop them so went through pads like no tomorrow and often suffered from burning brakes. I believe the majority ,including preserved EOG200 later had the high speed diffs replaced with standard, so did just normal Olympian speeds. I am no longer active on this forum. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 22 Guest(s)