Queen Square Bus Station
|
|
||||||
RE: Queen Square Bus Station
(15/02/2015 11:43)childwallblues Wrote: The problem these days is that the City Council have pedestrianized so much that as the saying goes we are now squeezing a quart into a pint pot. The only solution is better use of space already available. If small bits of pedestrianised street can't be made into a bus only road, then there is not a lot that can be done other than rearranging what already exists to squeeze as much capacity out as possible. I don't think that reorganising service timetables by allocating deckers will help in the long run; deckers are being bought for a reason, and that is not because passenger numbers are going down. If you reduce frequency now in favour of using deckers, then at some point in the not-too-distant future, the timetables will reach capacity and you're back to square one. I think Merseytravel will be missing a massive opportunity to increase QS's capacity when they relay the road. That said, they must have this in mind if they're spending 8 weeks on it, as resurfacing would take no more than a week tops. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 10 Guest(s)