From Saturday 9 November 2013 and Friday 28 March 2014, Network Rail will be carrying out major engineering work at the Holme Tunnel to strengthen and repair the tunnel, meaning that trains will not be able to run between Hebden Bridge and Burnley Manchester Road. |
||||||