Current time: 07/01/2025, 08:00 Hello There, Guest! (LoginRegister)

Post Reply 
Lancashire Triangle Electrification
RE: Lancashire Triangle Electrification
(09/09/2013 19:12)childwallblues Wrote:  
(09/09/2013 13:28)DVG526 Wrote:  
(07/09/2013 09:36)childwallblues Wrote:  The line is now energised between Castlefields Junction (Manchester) and Lowton Junction(Newton-le-Willows).
Mast bases are in place between Garswood and Bryn.

There are still a few gaps in the wires over the Moss, not sure how much of it is actually live although the switch on was supposed to be on Aug 4th.
Where are the gaps?

Between Astley and Ordsall Lane, all infrastructure in place just a few small gaps where the wires aren't quite fully knitted together. Can't be long though before we see a test train along there?
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Lancashire Triangle Electrification - DVG526 - 10/09/2013 08:04



User(s) browsing this thread: 20 Guest(s)