[Archive] Arriva North West - Birkenhead Depot
|
|
||||||
RE: Arriva North West - Birkenhead Depot
Don't get the rumoured 410 change, the short journeys will save about 9 minutes journey time in each direction so PVR will still be the same on a 30 minute headway with journey time in the evenings of about 52 minutes on the short journeys when the full length is 61 minutes journey time, so longer layover will have to be timetabled in. My Flickr site http://www.flickr.com/photos/31135444@N02/ |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 25 Guest(s)