Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: First Chester & Wirral
(31/08/2012 06:49)M60lad Wrote: Yes traffic through Cheshire Oaks has been and will always be a problem for Route 1, I think this is where it where it loses most of its time and also I'm guessing at busy times other problems have been the Junction improvement works in Ellesmere Port which delay services even more hence why you then get a 1 and 2 running together then from Little Sutton-Liverpool Good point, going through Cheshire Oaks will be worse in the run up until Christmas. I wonder if it'd be better swapping the 1 & X2 routes from Ellesmere Port to Chester when the X2 operates, but keeping the currant 1 route at other times, when the X2 does not operate. A side note i hate the prefix "X" being allocated to route numbers when they stop at every stop. like X2 & X30, as to me "X" means Limited Stop route. My Flickr site http://www.flickr.com/photos/31135444@N02/ |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 13 Guest(s)