London Overground
|
|
||||||
RE: London Overground
(11/07/2019 06:03)childwallblues Wrote: 710261/62/63/66/67/69 have all been modified and are now at work on the GOBLIN line. The 15 minute service has been re-instated and there are usually 4 x 710 ang 2 x 378 in service. The full 710 service shouls start at the end of July and the 3 x 378 will revert to 5 car formation for use on the other lines. It is a relief that several 710s are finally in service on Goblin. It is just a pity that on August Bank Holiday the service will only be half-hourly. This might be due to engineering works on the other London Overground line through Gospel Oak. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 17 Guest(s)