Arriva North West - Birkenhead Depot
|
|
||||||
RE: Arriva North West - Birkenhead Depot
The current 408/9 circular was only introduced to cover the withdrawn section of the 403. The 409 will probably revert to its original route both ways via Liscard Rd. Just another cutback to the LS PVR.. Blaming the bridge is poor although I'd love to see the dropped mileage figures for the 410/411. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 20 Guest(s)