Northern (Arriva Rail North)
|
|
||||||
RE: Northern (Arriva Rail North)
(19/04/2018 14:22)St Helens Rider Wrote: I have read on another forum that the wires are being energised on 6th May which only gives a fortnight for training with electric traction. The Preston - Blackpool North is signed by a fair few depots that already sign 319s. Blackpool North depot - a fair few are trained on 319 units Manchester Victoria depot - more than a fair few sign 319 units Wigan Wallgate depot - all crew should sign 319 units Liverpool Lime Street - all crew should sign 319 units Leeds City depot - no crew will sign 319 units however they exclusively work the sprinter operated Calder Valley services. So in short, I don't think crew that crew training will be an issue for electric units working the line |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 35 Guest(s)