Northern (Arriva Rail North)
|
|
||||||
RE: Northern (Arriva Rail North)
(13/01/2018 23:58)Metroline1511 Wrote: Blackpool North could indeed leapfrog Bolton for electric trains at this rate! My current idea is to wait for both these and also trams to Blackpool North before any such ride. That is, unless I feel like seeing the new Bolton Interchange before then. Liverpool South Parkway to Blackpool North is still on schedule to be an hourly electric service at the May timetable change but the way things are looking they'll be no usable overheads between Bolton and Preston by the May timetable change. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 31 Guest(s)