[Archive] Northern (Arriva Rail North)
|
|
||||||
RE: Northern (Arriva Rail North)
The Blackpool to Preston line will be closed for 3 months from December 2017 so the December 2017 timetable will show no through services to Blackpool North between Dec 17 and Mar 18. Services on routes not mentioned as having December 2017 enhancements will remain as they are until May 2018 or later. I think Liverpool to Calder Valley was a 2018 or 2019 improvement anyway but Liverpool to Manchester Airport via Warrington, Chester to Calder Valley, Mid-Cheshire line enhancements, Buxton line enhancements, Atherton line enhancements, Manchester Airport to Cumbria to Wigan (and presumably also TPE enhancements) all originally scheduled in for December 17 look to have been put back until May 2018 or later. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 129 Guest(s)