Merseyrail
|
|
||||||
RE: Merseyrail
This was also with the northern line services reduced to every 20 minutes . This seriously means that big events in Liverpool are going to cause problems for Merseyrail , due to the amount of units required to move all passengers. Seriously though couldn't the refurbishment of the Wirral line platforms at Moorfields have started later once the event became common knowledge . |
||||||
|
||||||
RE: Merseyrail
More six cars today in connection with the Mersey River Festival. A full complement of pairs on the Southport line and the three Chester workings which stay on into the evening (15 and 45 departures from Liverpool Central) were also sixes. Sensible allocating this time around with the more heavily loaded Chester workings strengthened. Further units to have received the interior refresh in the last couple of weeks include 507004, 507021 and 508139. The full list of treated units is as follows: 507004/008/009/018/020/021/024/029/033, 508103/104/139. |
||||||
|
||||||
RE: Merseyrail
There appeared to be a unit stripped back to its white primer inside Birkenhead North depot this afternoon. As it had yellow painted window seals, I'm assuming this is one of the 2014 liveried examples rather than 507002. I'm not sure if this is due to a severe graffiti attack (in which case, the graffiti protection is not good) or for some other reason such as another advertising livery. 508127 is the latest unit with a refreshed interior.
3101(i) | 3305 | 3616 | 4012 | 4159 | 4100 | 4102 | 4118 | 4127 | 4475
313044 | 313064 | 313220 | 314206 | 314210 | 315809 | 315839 | 315857 | 507001 | 507002 | 507006 | 507008 | 507009 | 508114 | 508138 | 508208 |
||||||
|
||||||
RE: Merseyrail
Major disruption on the Ormskirk line last night due to a failed train. I arrived at Ormskirk station for the 5:05pm train to be told there would be no service till after 6pm anyone know where the train failed and which unit it was? Had to get a taxi home. Thanks. |
||||||
|
||||||
RE: Merseyrail
507017 and was at or near Walton, train was evacuated and Merseyside Fire Service attended. |
||||||
|
||||||
|
||||||
RE: Merseyrail
Camshaft I've heard. Wonder how long that will be off the road for? |
||||||
|
||||||
RE: Merseyrail
Is there a shortage of units at the mo ? As the first train to Ormskirk this morning was only a 3 car instead of the usual 6 we are at leat one unit down with 507017 being off after its fire on monday. Thanks. |
||||||
|
||||||
RE: Merseyrail
At least two Northern Line diagrams where short formed . 0813 SP - HX and 0921 HX - SP and 0548 KBY - LVC 0610 LVC - ORM 0650 ORM - LVC 0725 LVC - ORM Probably not helped by the unit failure at Walton |
||||||
|
||||||
RE: Merseyrail
(19/06/2015 19:56)wirralbus Wrote: At least two Northern Line diagrams where short formed . 507001 is also laid up at New Brighton sidings at the mo awaiting its turn in the depot... |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 17 Guest(s)