Merseyrail
|
|
||||||
RE: New Fleet
(03/07/2012 23:19)507022 Wrote:(03/07/2012 11:17)First Class Wrote: I have been informed today that the most recent Merseytravel proposal for the rolling stock replacement is a mix of 3 and 4 carriage trains. They must have a specific train in mind as (IIRC), it stated there would be 274 seats per 3 car set. 6 car trains would no longer operate. So a Platform 8 bay? Personally think it would be a waste of time except during disruption. You don't need any more Liverpool-Liverpool S Parkway services!!! Currently: 6 trains per hour from Lime Street 4 trains per hour from Liverpool Central -- 10 trains per hour Liverpool-Liverpool S Parkway -- PLUS 82/86 bus every 5/10mins Why do we need an additional 4 services per hour via Merseyrail?? I wonder whether this may be to do with a possibility of Transpennine Express/East Midlands trains going via Chat Moss in the future?? |
||||||
|
||||||
RE: Merseyrail
507008 was outside Birkenhead North depot this lunchtime fresh from overhaul work. Beside the main shed, meanwhile, 507029 was in the siding with a temporary tail light attached to the New Brighton-facing end.
3101(i) | 3305 | 3616 | 4012 | 4159 | 4100 | 4102 | 4118 | 4127 | 4475
313044 | 313064 | 313220 | 314206 | 314210 | 315809 | 315839 | 315857 | 507001 | 507002 | 507006 | 507008 | 507009 | 508114 | 508138 | 508208 |
||||||
|
||||||
RE: Merseyrail
Due to a track circuit failure at Capenhurst services are meeting with delays this is being compounded by the fact that the Hooton line service is only four trains an hour causing some trains to suffer long dwell times , some trains not ALL trains on the line are six cars . |
||||||
|
||||||
RE: Merseyrail
I wonder whether the "6-car in section" problem caused the TC problems. When more than 1 6-car passes each other between Bache/Capenhurst, it can blow a load of lineside equipment. |
||||||
|
||||||
RE: Merseyrail
Track circuit problems caused by the weather in the end , service ended up being suspended this evening between hooton and Chester |
||||||
|
||||||
RE: Merseyrail
Service still remains suspended due to flooding at Capenhurst. |
||||||
|
||||||
RE: Merseyrail
Did 507002 return yesterday? |
||||||
|
||||||
RE: Merseyrail
Some nasty delays in the last hour or so on the northern line due to failed train at Sandhills. |
||||||
|
||||||
RE: Merseyrail
Train failed half in half out of Sandhills Liverpool bound on the country side of the station. |
||||||
|
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 13 Guest(s)