Current time: 27/11/2024, 21:52 Hello There, Guest! (LoginRegister)

Post Reply 
Merseyrail
RE: Merseyrail
Have 508110 and 508134 had any parts removed yet prior to their journey to Sims metals or will parts removal take place at Sims? Thanks.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 11:39)MX12CFE Wrote:  Have 508110 and 508134 had any parts removed yet prior to their journey to Sims metals or will parts removal take place at Sims? Thanks.

From what I've heard of Sims in Newport, any stock usually meets it's end very quickly after arriving....so I would guess anything useful would be taken off before leaving Merseyside

HTH

https://www.flickr.com/photos/dmc1947/
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 18:05)gka472l Wrote:  From what I've heard of Sims in Newport, any stock usually meets it's end very quickly after arriving....so I would guess anything useful would be taken off before leaving Merseyside

HTH

I don't think much will be removed from the units before they go for scrap because if you strip too much from them it'll affect the stability and weight so new acceptance certificates would be required

SK15 GZG
2010 | 2345 | 2474 | 2590 | 3052 | 3059 | 3061 | 5314 | 6408 | 6606 | 7537
4164 | 4593 | 4664 | 4670 | 4672 | 4678 | 4836
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 18:24)SK15 GZG Wrote:  I don't think much will be removed from the units before they go for scrap because if you strip too much from them it'll affect the stability and weight so new acceptance certificates would be required

they problem strip some interior parts that can be used to keep other units going
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 18:28)Harryn9000 Wrote:  they problem strip some interior parts that can be used to keep other units going

If anything's removed it'll be things from below the solebar such as traction motors as they'd actually be useful and worth keeping. On saying that though I'm sure Merseyrail has enough spare parts for the PEPs until withdrawal of the type has been completed

I don't really see the point or need to retain any interior parts like lights, seats etc. They'll only end up going in the bin when the PEPs are no longer around anyway

SK15 GZG
2010 | 2345 | 2474 | 2590 | 3052 | 3059 | 3061 | 5314 | 6408 | 6606 | 7537
4164 | 4593 | 4664 | 4670 | 4672 | 4678 | 4836
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 18:34)SK15 GZG Wrote:  If anything's removed it'll be things from below the solebar such as traction motors as they'd actually be useful and worth keeping. On saying that though I'm sure Merseyrail has enough spare parts for the PEPs until withdrawal of the type has been completed

I don't really see the point or need to retain any interior parts like lights, seats etc. They'll only end up going in the bin when the PEPs are no longer around anyway

ye they will source part that will be useful to keep rest going so if something is useful they will take it off i'm sure
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 08:39)wirralbus Wrote:  So Merseyrail are now back to 57 units , its at this point maintaining the units becomes very important

It looks as though there is a timetable change coming from the start of September.
All the Northern line resuming a 15 min frequency again, with the Ormskirk and Kirkby joining Southport and Hunts Cross with the increase in frequency.
The Wirral however seems that the 30 min service (with 6 car runnings) will continue for a good while, at least until the start of December by the looks of it.

One thing to note, it seems they have now removed one of the 6 car peak services on Ormskirk line during weekday peak. As a result probably of 508110 now being withdrawn.

When they withdrew 508134, the 6 car West Kirby peak service was cut.
Therefore, there should be no change in the number of units in "planned" maintenance or "saving on miles" off peak and at weekends (at least if normal service was resumed across all lines).
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 11:39)MX12CFE Wrote:  Have 508110 and 508134 had any parts removed yet prior to their journey to Sims metals or will parts removal take place at Sims? Thanks.

508134 has had parts removed, but I doubt 508110 has Had as much, if any, since it’s been withdrawn less than 48 hours
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
Two paths in RTT for Sunday night, one departing at 2034, the other at 2137, from Birkenhead North depot to Craven Arms..
.with corresponding engine moves arriving from Leicester beforehand....

HTH

https://www.flickr.com/photos/dmc1947/
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(14/08/2020 20:13)507022 Wrote:  508134 has had parts removed, but I doubt 508110 has Had as much, if any, since it’s been withdrawn less than 48 hours

Has 508134 been moved from New Brighton then?

---
Thanks
Ant

Check out my YouTube Channel updated regularly at 18:00 Most Days;
https://www.youtube.com/c/apdmediatransp...nel/videos

Check out my content on Flickr:
https://www.flickr.com/photos/envirohunter
https://www.flickr.com/photos/envirohunter/albums

Updated recently with a trip down to the South Coast in 2021 & Railway Pictures from 2017.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 38 Guest(s)