Forum | Merseyside Dennis Dart Website

Full Version: Thameslink and Great Northern
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14
700140 is now in service.
700143 has arrived in the UK from Germany.
The first Class 365 to go into store are 365501 and 365506 at Ely Papworth Sidings.
(16/02/2018 07:40)childwallblues Wrote: [ -> ]The first Class 365 to go into store are 365501 and 365506 at Ely Papworth Sidings.

It was 365505 not 365506
Obviously mis-reported!
First passenger trains expected to run from GN through to London Bridge on 26 February, two Peterborough-KX services will run to Horsham and one Brighton-London Bridge to Cambridge
It has been reported that 365527 and 365533 were taken to Ely for storage on Sunday by 57303.
(20/02/2018 11:32)childwallblues Wrote: [ -> ]It has been reported that 365527 and 365533 were taken to Ely for storage on Sunday by 57303.

https://www.youtube.com/watch?v=teSCfnJmVnk
Class 365523 at Springburn Works.

https://www.youtube.com/watch?v=Y199E-CBEEU
Very interesting move. That seems to confirm a rumour that I have heard that Scotrail are taking some 365s to cover for the 385s that have not been put in service due to windscreen problems.
Seems that at least 10 x 365 are going to Scotrail.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Reference URL's