RE: Merseyrail
(21/01/2026 20:09)507022 Wrote: Given the amount of works required in such a tight space and no major possessions proposed for 2026 for that route, I think even 2028 is very optimistic.
The logical time to do it would be with the link line slab track renewal but that’s not happening any time soon.
Where about does the slab track renewal need to take place, between what stations?
|
|
|
|
|
RE: Merseyrail
(Yesterday 22:09)508134 Wrote: Where about does the slab track renewal need to take place, between what stations?
In the underground from Leeds St to St James Old station, I believe
|
|
|