03/11/2025, 19:12
They were making a deal about having an "all electric" fleet, which doesn't really apply if they keep a few old diesel deckers. Although, given they've won and lost contracts both in Warrington and outside, since the order was placed, I suppose it's difficult to keep a fleet the right size for everything, that's all electric. Would they be able to order something like 2 extra buses, once the entire fleet is delivered? Or would someone like Mistral be able to lease them 2?