Current time: 20/04/2024, 04:00 Hello There, Guest! (LoginRegister)

Post Reply 
Stagecoach Manchester and Wigan
RE: Stagecoach Manchester and Wigan
19345[Stockport bus] on 42B today
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(15/01/2019 17:03)gilbert Wrote:  19345[Stockport bus] on 42B today

And on the 15 today.

19331 [Wigan?] on the 38 today.
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(18/01/2019 21:31)gilbert Wrote:  And on the 15 today.

19331 [Wigan?] on the 38 today.

Both the above on the 42B yesterday or today.Transfers or loans?
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(18/01/2019 21:31)gilbert Wrote:  And on the 15 today.

19331 [Wigan?] on the 38 today.

19331 is on loan whilst a Hybrid Enviro400 is at Wigan for engineering purposes.
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
Green bus funding has been awarded but only for 32 of the BYD/Enviro City Enviro400's all will work from Sharston Depot on two specific routes. The remaining part of the bid for a further 73 has been unsuccessful on this occasion.
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(07/02/2019 00:28)gilesbus1 Wrote:  Green bus funding has been awarded but only for 32 of the BYD/Enviro City Enviro400's all will work from Sharston Depot on two specific routes. The remaining part of the bid for a further 73 has been unsuccessful on this occasion.

Thanks for clarifying the bid being part of the application for 105 such buses. Obviously, the 43 will be one route but that doesn't leave much left. The question is, how will this affect the declared intent to move remaining low emission buses to other south M' cr, Trafford and Salford routes?
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(07/02/2019 04:15)Brickmill Wrote:  Thanks for clarifying the bid being part of the application for 105 such buses. Obviously, the 43 will be one route but that doesn't leave much left. The question is, how will this affect the declared intent to move remaining low emission buses to other south M' cr, Trafford and Salford routes?

Waste should be on the 192 or 42 not the 43 as they do more inner city work.
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
Does anybody know how long it takes to order 32 buses and have them built and ready? The thing is the article states that the ones for Stagecoach should be ready and in service for Autumn this year so that probably means they'll be in service for about Septembr/October at the latest.
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(07/02/2019 06:48)Mrboo Wrote:  Waste should be on the 192 or 42 not the 43 as they do more inner city work.

Like me I suspect, predictive text has hit this reply. Should the word waste read something completely different?
Find all posts by this user
Quote this message in a reply
RE: Stagecoach Manchester and Wigan
(07/02/2019 07:51)Brickmill Wrote:  Like me I suspect, predictive text has hit this reply. Should the word waste read something completely different?

Notwithstanding the word waste, 42 & 43 are identical between Withington and Piccadilly so no difference in terms of Inter city work. Besides the Clean Air Act doesn't discriminate on the basis of straight demographic s. Also, Sharston is quoted as the sole recipient depot. 42 group is run by Hyde Road and 192 by Stockport.
Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 6 Guest(s)